...our three beautiful girlies!

Tuesday, July 26, 2011

we've moved...

Our address has changed!  We are so excited to finally be official owners of our new home and 28 acres!  The last few weeks have been a whirlwind - packing, remodeling, moving, more remodeling, and more remodeling!  It's amazing the changes that took place in the 10 days we had to renovate and be out of our old house... and we are definately not quite through.  Reason???? Well, my minor changes turned to some major changes, but I have to say, for the better!!  Original plan:  scrape ceilings, cover fireplace, and put new carpet down in bedrooms and tile in master bathroom... Then the painters showed up for a 2-3 day job, and ended up with a 6 day job, thanks to me.  Yes, once they are at work painting, the following is too common a phrase, "Well, might as well do it now, while they are doing everything else..."  HA!  I had my ceilings scraped and painted... plus: new built in cabinets built and repainted, all trim and doors painted, closets painted, two bathrooms hand textured and painted.  I also got my fireplace covered with stone... then added under the bar in the kitchen.  Which led to paint on the kitchen cabinets, and new counter tops.  They patched some holes in my ceiling where I had a furdown wall and cabinets removed, new lighting, new door knobs.  Then came the flooring... it started with tile in the master bath (which was previously carpet!!) and a little patch in front of the fireplace.  Turns out, they could patch that with wood and the "patch" tile (plus the additional tile I ordered) got assigned to the kitchen flooring.  "Might as well do it now," though, RIGHT?! ;)

Results... not quite finished... but AH-MAZING transformation!!!!!  I am really falling in LOVE...


Before:  Ugly fireplace with wood burning insert and cheap cabinets setting on the hearth.  Also, notice ugly patch of tile on floor in front of fireplace. 


And Viola!  After:  Stone covered fireplace, old hearth and columns torn out, stove insert removed, and new built in cabinets.  Still to come, a new hearth and wood flooring in front of the fireplace... no more ugly tile!  Plus, new paint color on walls this week!


Before... There was suede adobe red paint on the wall, brown cabinets, furdown wall with cabinets above bar which left the kitchen feeling extremely tiny and dark.

After!  Furdown wall and cabinets above sink and bar - down!  Brown cabinets - painted fresh dover white!  Stone under bar - bar cut down and lowered to counter height (to make one large counter top/bar instead of raised bar)!  New  stainless range and microwave and my black fridge! 
Still to come... tile floors, granite counter tops and new sink!! Plus, the walls are now hand textured and I am painting them in the next day or two! This is NOT the completed project, but isn't the difference amazing!?

Finally, the last MAJOR change... the master bath...



Before:  Gold fixtures, adobe orange paint, carpet.  Boo!  (Sorry, don't know why it won't turn horizontal!!)



After:  Working on tile (finishing this week), toilet in the bath (temporarily!!), new light fixtures, and hopefully painting trim on shower nickel to match! Don't you LOVE the color!! So "Spa" :) 

Soooooo, as you can see, we are HARD at work!  Still lots to do, and I will post more pics when it all comes together!! 

1 comment:

  1. the house looks great!!! keep 'em coming! we are remodeling too...it is a lot of work!

    ReplyDelete